ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor
ISUZU electric truck mounted 6cbm garbage compactor

ISUZU EVM600 rear loader trash compactor

ISUZU electric new energy refuse compactor truck is designed based on EVM600 series truck chassis, mounted with 6000Liters garbage compactor body, based on internaional T420 material, thickness for side 4mm and floor 4mm, rear loading type and suitable for 240L and 1100L international standard garbage bins, integrated CAN BUS electric control box in cabin and rear hopper, which efficiently for working and convenient for usage. Painting and Logos 100% customized to meet all customer requirement.

  • Work capacity:

    6CBM
  • Dimension ( mm ):

    7030*2200*2500 mm
  • Wheelbase ( mm ):

    3365 mm
  • Engine power:

    185KW / 251HP
  • Engine type:

    TZ370XS-LKM1201
  • Axle drive:

    4x2, LHD
  • Remarks:

    New energy Electric type garbage truck

South American clients from Haiti, who purchased multiple units ISUZU EVM600 rear loader garbage truck, which is manufactured by CEEC TRUCKS, and the ultimate garbage collection machine in the waste management area. Which designed based on ISUZU EVM600 electric truck chassis, matched with CATL 107kwh lithium iron phosphate battery, 4 sets independent battery, with each battery 26.73kWh, rated voltage is 154.56V, matched working with TZ370XS-LKM1201 motor, peak power can be 185kw and peak torque can be 1200N.m, and the motor controller is  KTZ54X38S-LKC1201, which is liquid cooling type, smart and reliable for working. Upper body matched with T420 material rear loader type compactor body kit, rear lifting device can be 240L and 1100L international standard bins, both metal material and plastic material are available.

ISUZU 6cbm EV refuse compactor truck manufacturer

 

*ISUZU EVM600 Electric Garbage Compactor Truck

Isuzu EV 6cbm rear loader truck* 

-----------------------------------------------------------------

 

CEEC factory is professional manufacturer in truck area,
guarantee all products Brand-New and High-Quality.

 

▶ Features:

 

★ CATL battery with 106.95kwh, separately 4 battery

★ Electric type with 185KW motor, 100,000 Km without prblem.

★ Japanese ISUZU EVM600 newly cabin

★ 6CBM compactor body, T420 material, thickness for side and floor 4mm

★ Rear tilting device for 240L, 360L, 770L, 1100L bins

★ Integrated CAN BUS & Hydraulic control system

 

ISUZU EVM600 rear loader compactor truck

 

  • ISUZU electric refusel garbage truck
    ISUZU electric refusel garbage truck
  • ISUZU 6cbm trash compactor truck manufacturer
    ISUZU 6cbm trash compactor truck manufacturer
  • ISUZU EVM600 rear loader garbage truck
    ISUZU EVM600 rear loader garbage truck
 

▶ ISUZU EVM600 Refuse Compactor Truck Parameters:

 

ISUZU EVM600 rear loader truck 6cbm drawing

TRUCK Model

ISUZU EVM600 refuse compactor truck

Manufacturer

CEEC TRUCKS

Vehicle Parameters

 

7030x2095x2560 (mm)

Curb Weight:

5200Kg

GVW:

8995kg

Wheelbase:

3360mm

Drive Type:

Motor Direct Driving

Motor

Motor Model:

TZ370XS-LKM1201

Motor Type

Permanent magnet synchronous motor

Rated /Peak Power:

100kW / 185kw

Rated /Peak Peak torque:

500N.m / 1200N.m

Rated / Peak Speed

1910r/min / 4500r/min

Protection Stage

IP68

Insulated Stage

H

Working System

S9

Cooling Model

Liquid Cooling

Motor Controller

Model

KTZ54X38S-LKC1201

Continues Working Electricity

205A

Short-time Working Electricity

350A

Protection Stage

IP68

Working System

S9

Cooling Model

Liquid Cooling

Auxiliary Motor Controller

Model

FA4Z5.5SCF00

Protection Stage

IP68

Rated Inlet Voltage

600Vdc

DC/AC Output Voltage

380Vac

DC/AC Rated Power

5.5kW & 5.5kW

DC/AC Peak Power

7.5kW & 7.5kW

DC/AC Rated Electricity

13A & 13A

DC/AC Peak Electricity

19.5A & 19.5A

DC/DC Rated Power

3kW

DC/DC Rated Electricity

110A

Battery

Battery Brand/ Model:

CATL/ L173TB2

Battery Type:

Lithium iron phosphate

Battery Capacity:

106.95kwh

(4 sets indeendent battery, with each abttery 26.73kWh, rated voltate is 154.56V)

Driven Unit

Model

STED3010S

Maximum Output Torque

1300N.m

Speed Ratio

2.743/1.000

Fuel Charge

1.8L

Transmission Box Model

J2S130

Electric Turning Pump

Model

2149 08158 001

Power

1.5kW

Voltage

AC380V

Electricity

3.5A

Speed

1500r/min

Protection Stage

IP68

Insulated Stage

H

Flow Rate

12L/min

Pressure

12Mpa

Rotation Direction

Right Side

Electric Compressor

Model

8103010-GEA00

Rated Voltage

DC540V

Refrigerating Fluid

R134a

Electric Water Pump

Model

02.03.222.1009

Performance

Maximum Speed:

90km/h

Endurance mileage:

280km

Charge mode:

Fast charge

Max Climb Capability

30%

Seats

Front Seat:

3

Chassis

Front/ Rear Wheel Distance:

1640/1655mm

Front/Rear Suspension

1121/1387mm

Axle Loads:

3300/5695kg

Approach/Departure angle:

23/19

Leaf Spring:

6/6+6

Tires:

7 (Including Spare Tire)

Tire Model:

7.50R16LT 16PR

Standard Configuration:

1

Power steering system

2

Air Conditioning

3

ABS

4

Tubeless Tire

Garbage body

Capacity

6cbm

Material

Super stronger steel

Thickness

Side 4mm

Floor 4mm

Hydraulic Cylinder

Push Plate 1 set

Rear Hopper 2 sets

Slide Plate 2 sets

Scraper 2 sets

Rear Tilting Device 2 sets

PTO

High quality brand

Gear Pump

Dual hydraulic oil pump connects with PTO

Control System

Hydraulic Control Valve

CAN BUS Electric Control Box

Rear Tilting Device

Optional 1 with 2 sets 240L bin

Optional 2 with 1 set 1100L bin

Light System

Full sets LED safety light system

Painting & Logos

As customized

Fast Charge time

1.5 hours

 

ISUZU EVM600 trash compactor rear loader

 

▶  EVM600 Isuzu electric truck Component:

ISUZU EVM600 series electric truck chassis is the third generation EV truck, which used top 1 chinese brand CATL battery, matched working with reliable MOTOR and control, so can guarantee the ISUZU truck an ideal chassis to be modify as multiple type special trucks. Below showing main component of ISUZU truck chassis.

 

Isuzu EV truck motor

Isuzu EV truck motor

 

Motor Model:    TZ370XS-LKM1201
Motor Type:    Permanent magnet synchronous motor
Rated /Peak Power:    100kW / 185kw
Rated /Peak Peak torque:    500N.m / 1200N.m
Rated / Peak Speed    1910r/min / 4500r/min
Protection Stage    IP68
Insulated Stage    H
Working System    S9
Cooling Model    Liquid Cooling

Isuzu EV truck auxiliary motor controller

Isuzu EV truck motor controller

 

Model    KTZ54X38S-LKC1201
Continues Working Electricity    205A
Short-time Working Electricity    350A
Protection Stage    IP68
Working System    S9
Cooling Model    Liquid Cooling

ISUZU EV truck auxiliary motor controller

Isuzu EV truck motor

 

Model    FA4Z5.5SCF00
Protection Stage    IP68
Rated Inlet Voltage    600Vdc
DC/AC Output Voltage    380Vac
DC/AC Rated Power    5.5kW & 5.5kW
DC/AC Peak Power    7.5kW & 7.5kW
DC/AC Rated Electricity    13A & 13A
DC/AC Peak Electricity    19.5A & 19.5A
DC/DC Rated Power    3kW
DC/DC Rated Electricity    110A


ISUZU EV truck mounted with CATL battery 107kwh

ISUZU EV truck mounted with CATL battery 107kwh

 

Battery Brand/ Model:    CATL/ L173TB2
Battery Type:    Lithium iron phosphate
Battery Capacity:    106.95kwh
(4 sets independent battery, with each battery 26.73kWh, rated voltage is 154.56V)

Isuzu EV truck driven unit

Isuzu EV truck driven unit

 

Model    STED3010S
Maximum Output Torque    1300N.m
Speed Ratio    2.743/1.000
Fuel Charge    1.8L
Transmission Box Model    J2S130


Isuzu Electric truck turning pump

Isuzu Electric truck turning pump

 

Model    2149 08158 001
Power    1.5kW
Voltage    AC380V
Electricity    3.5A
Speed    1500r/min
Protection Stage    IP68
Insulated Stage    H
Flow Rate    12L/min
Pressure    12Mpa
Rotation Direction    Right Side

 
Isuzu electric truck compressor

Isuzu electric truck compressor

 

Model     8103010-GEA00
Rated Voltage    DC540V
Refrigerating Fluid    R134a


Isuzu Electric truck Water Pump

Isuzu Electric truck Water Pump

 

Model    02.03.222.1009

 

ISUZU EVM600 electric garbage compactor truck

 

▶  How to manufacture Isuzu EV rear loader:

After ISUZU EVM600 light duty electric truck chassis arrived our factory, we CEEC TRUCKS Engineer Department design the CAD drawing of the upper compactor body kit, start installed the PTO on truck chassis and gear pump to get power from ISUZU electric truck. Then installed the customized 6cbm rear loader body kit on it, connected with gear pump to guarantee all hydraulic cylinder moving, then can realize all hydraulic function. 

 

How to manufacture ISUZU EVM600 rear loader truck

 

Isuzu electric garbage compactor truck factory

 

▶  Advanced features for Isuzu Electric Garbage Truck:

ISUZU EVM600 light duty electric rear loader compactor truck is designed for solid waste collection, compression and transprotation, which use dual-track packing system, push shovel matched working with nylon plate for smoothly working, and this system is designed with double way compressing function, matched working with back pressure valve, to guarantee loading ability more efficiency. CEEC TRUCKS adope multiple nylon plate for rear sliding plate, and making up and down working more efficiently. The rear loading type can be customized as 240L and 1100L internation standard garbage bins, lifting capacity can be over 1000kg.
  • Isuzu EVM600 truck cabin
    Isuzu EVM600 truck cabin
  • Garbage compactor truck PTO control button
    Garbage compactor truck PTO control button
  • Rear view of the rear loader truck
    Rear view of the rear loader truck
  • 6cbm rear loader compactor body kit
    6cbm rear loader compactor body kit
  • Top mounted LED safety light
    Top mounted LED safety light
  • Lower mounted LED safety light
    Lower mounted LED safety light
  • Rear hopper mounted CAN BUS control button
    Rear hopper mounted CAN BUS control button
  • CE certify Hydraulic control valve
    CE certify Hydraulic control valve
  • Sewage water tanker to avoid second polution
    Sewage water tanker to avoid second polution
 
 
Products--100% Customized Level One!
Transportation--100% Safety, Convenience, Efficient!
Services--7days + 24hours Safetify Service!

 

1.we can do the designs according to the your requirement .

2.we can offer you the high quality & reasionalble price

3.we can offer your a reliable after-sell service 

4.we have skilled professinal design team

5.promptly delivery. any order is welcome.

 

CEEC factory also supply spare parts (original, OEM, and replacement) for all types of trucks and trailers with discount and nice quality to ensure our customers's trucks and trailers being in good working conditions.

 

★  New energy EV type, ZERO emission, super powerful

★ TOP 1 brand CATL battery, 107 kwh

★ 6CBM compactor body capacity can be optional.

★ 12 months fast moving spare parts for FREE

★ Authorized ISUZU Garbage Compactor Truck exporter

★ Easy operation and easy maintenance

 

ISUZU electric rear loader truck 6CBM for export

 

ISUZU electric rear loader truck 6CBM

 

CEEC TRUCKS is a leading supplier of fire fighting truck in China. We possess over 10-year export experience of fire truck. We can ensure the fast delivery time and 12 months guarantee for our fire engine. Our fire engines are sold to more than 80 countries including Eastern Europe and CIS countries, Africa, Southeast Asia, Central and South America, Middle East, etc.

 

---- Maximize save your sea freight.

---- Professional guidance on your importing documents.

---- Safety, Quickly, Timely

  

CEEC garbage compactor truck factory review

 

---- Service more than 60 countries.

----  Professional guidance on your importing documents.

----  CO, FORM E, FORM P, Pre-shipping Inspection...

 

 export documents
Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit

Related Products

Isuzu ELF commercial rear loader garbage truck
Isuzu 10 CBM split body rear loader truck
The CEEC's Isuzu NPR rear loader garbage truck is a municipal vehicle used for garbage collecti...
Brand new ISUZU 4CBM Waste compressor truck for sale
ISUZU 4CBM Refuse compact truck
ISUZU 4m3 rear-load garbage collection truck, the truck chassis use ISUZU 98HP diesel engine, MSB 5-...
Japan ISUZU 16 CBM garbage compactor truck made in China
ISUZU FVR 16CBM garbage compactor truck with factory direct sale
China TOP quality heavy type ISUZU 16cbm garbage compactor truck, which use ISUZU brand 4HK diesel e...
ISUZU 205hp FTR 10 CBM garbage compactor truck made in China
ISUZU FTR 10 CBM garbage compactor truck with factory direct sale
ISUZU FTR garbage compactor trucks 10 CBM export to Dubai, ISUZU 6HK1 engine, with 205HP, MLD 6-shif...
ISUZU Giga garbage compactor truck with factory direct sale
ISUZU Giga garbage compactor truck
ISUZU GIGA 4x2 garbage compactor trucks 20 CBM export to South Asia, ISUZU 6WG1 engine, with 420HP, ...
ISUZU Giga garbage compactor truck with factory direct sale
ISUZU Giga garbage rear loader truck
ISUZU GIGA 4x2 garbage compactor trucks 20 CBM export to South Asia, ISUZU 6WG1 engine, with 420HP, ...
 Isuzu GIGA 4X2 waste compactor truck
Isuzu 15 cbm waste compactor trash truck
The Isuzu 15m3 waste management truck is an excellent choice for waste management com...
Isuzu GIGA 4x2 12000L drinking water transport truck
Isuzu GIGA potable water service truck
The Isuzu FTR GIGA 4x2 12000L drinking water truck is a versatile and reliable solution for a wide r...

Need Help? Chat with us

Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Submit
Looking for About
Contact us #
+86 13647297999

Home

Products

whatsApp

contact